Fuel tank and capacitance fuel sender in place behind my wooden firewall
- temporary of course :)
(5/00)
Installation of rudder cables and control system (9/99)
Construction Photos in Reverse Chronological Order
A little destructive weld-testing on the fuselage!
Rudder/brake pedal and brake cylinder installation
Lauren enjoys piloting with the fuselage on the gear and vertical fin
in place (Fall 1998)
Installing and aligning the gear. The axles are clamped to a piece
of angle iron for alignment
From mid-March to Mid-April not very much work got done for a variety
of reasons. Once I got going again, it was time to start making the
multitude of brackets that eventually get welded onto the fuselage structure.
Back to the not so exciting part of construction! Brackets,
brackets, and more brackets!
Through February and early March 1998 things looked like
this while the fuselage is welded up.
The fuselage sees the first light of day, while the construction table
is being disassembled to make space for final welding
Early February 1998
Tack welded into position - and with the jigs removed - January
1998
Jigs to keep things
square